Project description:
The solar power system was installed on the roofs of two buildings at the project site. The project’s objective was to significantly reduce fossil fuel consumption and electricity costs. As part of the project, a photovoltaic system with a total nominal capacity of 36.75 kWp was installed to generate renewable energy.
Project description:
Procurement of an induction heater, bearing pullers and a forklift truck.